400-088-0573Improper pipe connection is likely to cause pipe blockage. The principles that need to be followed in the process of pipeline connection are as follows: In the process of pipeline layout, the transmission resistance must be reduced as much as possible according to the few elbows and the short distance, which can reduce the probability of pipe blockage. At the pump outlet stack pipe position, can not directly connect the bend pipe, need to connect a straight pipe of more than 500 mm, and then connect the bend pipe (as shown in Figure 1). When connecting pipelines in the middle of pumping, only one can be added each time, and the inner wall of the pipeline should be fully lubricated with water, and the inner wall of the newly connected pipe fittings should be clean and free of debris, otherwise it is likely to lead to tube blocking. As far as the vertical pipe is concerned, the upper bend of the riser must be handled with the head up, and the anti-segregation device must be installed at the outlet position, which can prevent the pipe blocking.
In addition, in the high-rise pumping process, usually the length of the horizontal line must be 15% larger than the vertical line length, and the line stop valve must be connected to the horizontal line. If the shutdown time is more than five minutes, it is necessary to close the stop valve in time to avoid concrete backflow and reverse pressure, causing tube blocking.