Pipeline installation of concrete drag pump

2023-09-18 09:52:24 Concrete pump trucks-factory-Truemax Read

Concrete drag pump

The transport of concrete pump is carried out through the pipeline, so the installation and fixing of concrete pump pipeline is very important, which is also a very important part of the construction safety, if the concrete pump pipeline is not fixed firmly, it may affect the construction, and even lead to safety accidents.1. It must be noted that the pipeline of the concrete drag pump shall not be directly supported on the steel bar, template and embedded parts.

2. The horizontal pipe should be fixed every certain distance with supports, cushions, spreader, etc., in order to facilitate the removal of blocked pipes, installation and disassembly and cleaning of pipes.

3. When the vertical pipe is fixed on the scaffold, the scaffold can be reinforced as required.

4. The vertical pipe should be fixed at the hole on the top of the wall and column or floor with embedded parts.

5. The bend pipe at the lower end of the vertical pipe should not be used as the support point of the upper pipe, and steel support should be set up to bear the weight of the vertical pipe.

6. Each section of pipe on the wall and column shall not be less than 1 fixed point; The reserved holes in each floor shall be fixed.